The final piece of the puzzle was put in place today with some help from my friend Viktar: we connected and tested the fresh water pump. With that, fresh water system plumbing is complete! The original plan was perfectly executed in 3 months.

First toilet flush test

Well, after all the hoses and wires were connected the toilet appeared to be dead. As I started troubleshooting, I realized that an inline fuse holder was wired into the +12V wire from the battery but I never actually put a fuse in it! Once that was fixed, we were in business. No leaks, no troubles. Happy!

First test of the plumbing

Performed the first test of the pluming by connecting a hose to the city water inlet. Almost everything worked just fine. So awesome to have faucets in the galley and head working! A few leaks showed up but I think all of them can be fixed with adding plumbers tape. Off to a good start!