Finalizing cutting board

Made a piece for the front of the cutting board, rounded edges, and glued it in.

Then made a juice groove by sticking a centerpiece on the board using double-sided tape and then routing around it. Hindsight: might have been better to use CNC for this and do a cleaner groove with shape closer to square.

Galley dry fit complete, stove mounted

Took some time to fit all the CNCd pieces together. Man, this boat has no straight angles anywhere and all the measurements end up requiring some adjustment when parts are installed. Nevertheless, it call came together today. Not 100% done but only minor fit adjustments left to finalize it.

Galley storage refreshed

Finally got to the galley storage shelf. Replaced side panel, painted interior light gray, and sanded/stained/varnished teak frame. Also added rubber liner to keep things from sliding around inside.

Next up for it: install LED strip inside, replace old sliding doors with new semi-transparent panels, and mount it securely.

Fridge arrived

The new Fridge arrived. Fits really well. This is the Isotherm Cruise 65 Clean Touch Stainless Steel, 2.3 cu.ft., AC/DC

Still need to design and build out the galley shelving around it but it’s good to have it so I can finalize measurements for the panels.