Galley storage refreshed

Finally got to the galley storage shelf. Replaced side panel, painted interior light gray, and sanded/stained/varnished teak frame. Also added rubber liner to keep things from sliding around inside.

Next up for it: install LED strip inside, replace old sliding doors with new semi-transparent panels, and mount it securely.

Fridge arrived

The new Fridge arrived. Fits really well. This is the Isotherm Cruise 65 Clean Touch Stainless Steel, 2.3 cu.ft., AC/DC

Still need to design and build out the galley shelving around it but it’s good to have it so I can finalize measurements for the panels.

First test of the plumbing

Performed the first test of the pluming by connecting a hose to the city water inlet. Almost everything worked just fine. So awesome to have faucets in the galley and head working! A few leaks showed up but I think all of them can be fixed with adding plumbers tape. Off to a good start!