The first set of custom tiles is ready: a lighthouse, seashell, starfish, marlin, mermaid reading a book, seagulls, and a horse running through water.
Installed galley table
Deck shower / city water inlet / galley faucet
Head wired in
Finally, chainplate covers!
It’s been years since the chainplates were put in place and all these years I’ve been missing the chainplate covers. Things started leaking so I couldn’t wait any longer. These were hard to find as the chainplates are pretty massive: 2.5″ x 0.25″ in profile. I finally found a pair at Hansen Rigging!
Connected fireplace
Water tank upgrades
Installed water level sensor and bibs for fill and vent hoses on the water tank. Also updated the outflow hose and added a shutoff valve. Connected the fill hose to deck fill and installed the vent hose loop but haven’t yet attached to the tank (waiting for sealant to set).
Also installed the water level gauge. Not wired in yet.