My original idea to glass in the locker wasn’t good: realized I may need access in the stern area behind it so ideally it would be removable. Adjusted the plan and mounted it with fasteners. Hid 2 of them under the hinges. Also added the drain hose (and new thru hull). Did a dry fit of the lid and added spring to hold it in place. Also did a small cut to make the lock work. Turning out exactly as I envisioned it. Can’t wait to see it painted and finished.