Posted on January 15, 2018January 16, 2018Thru-hulls are DONE! With installation of the strainer, the thru-hulls/seacocks install can be marked as 100% complete. Yay!
Posted on January 15, 2018January 16, 2018Dry-fitting mast base Fitted mast base, drilled holes, and tapped them to be able to bolt it down. One interesting find from this is that the white center line on the boat is about 1/2″ off center. Crap. Guess, we’ll just live with that. The organizer plate looks great!
Posted on January 13, 2018January 16, 2018Final prep for engine install Met with Sean to do final planning, measurements, and parts buying for the electric engine install. That 2A cable is heavy!