Started building table leg base

The table in the saloon needs a base to screw the leg into (can’t put screws into the hull, duh!). Used some leftover teak cutouts from the handrail making to build the starting shape for the 12″ base. Fusion360 helped dial in the sizes, 6 parts give us 60 degree angles for the chuck saw. The inside surfaces are all over the place but they will not be visible anyway so no reason to square that.

Fridge arrived

The new Fridge arrived. Fits really well. This is the Isotherm Cruise 65 Clean Touch Stainless Steel, 2.3 cu.ft., AC/DC

Still need to design and build out the galley shelving around it but it’s good to have it so I can finalize measurements for the panels.

It’s a wrap!

The final piece of the puzzle was put in place today with some help from my friend Viktar: we connected and tested the fresh water pump. With that, fresh water system plumbing is complete! The original plan was perfectly executed in 3 months.