Epoxy finally kicked in and the new ceiling light in the head is done. It’s pretty awesome with touch controls, dimmers, and red light option.
Fridge arrived
The new Fridge arrived. Fits really well. This is the Isotherm Cruise 65 Clean Touch Stainless Steel, 2.3 cu.ft., AC/DC
Still need to design and build out the galley shelving around it but it’s good to have it so I can finalize measurements for the panels.
Tile set on mortar
With help from my friend Viktar, made new teak trim and bulkhead to box in the tile area, lined it with HDPE, and set tile on mortar.
Swapped out the tank level gauge
When the new water tank level gauge was wired in it turned out to be dead and showing “Full” all the time, for any level. A new gauge put in today finally shows real water level.
Galley: paper towel holder
New head sink light
Installed CO / LP leak alarm
In prep for testing the fireplace & gas cooking stove, wired in and mounted combo CO / LP leak alarm. Put in 85 Series from MTI.
Final set of tiles is ready
The custom tiles I cut a few weeks back are now ready to go. We’ve added 3 more full size tiles to complete the set. This final set includes: beach umbrella, mermaid cat, kelp, waves, swimmer, fish, looking glass, and a tiny compass rose.
It’s a wrap!
The final piece of the puzzle was put in place today with some help from my friend Viktar: we connected and tested the fresh water pump. With that, fresh water system plumbing is complete! The original plan was perfectly executed in 3 months.