Posted on January 13, 2018January 16, 2018Final prep for engine install Met with Sean to do final planning, measurements, and parts buying for the electric engine install. That 2A cable is heavy!
Posted on January 7, 2018January 9, 2018Repairing fiberglass fuckups Poor job done by the “professional” we hired resulted cracks as soon as some pressure was put on cabin top during beam installation. Grinding teeth while grinding off fresh paint and non-skid As suspected, the cracks are along the edges of repaired areas There is still wet core in there Strengthening with some cloth Helping epoxy cure in the cold weather with a heat gun
Posted on January 5, 2018January 6, 2018Rain, rain, go away! Masking Mixing epoxy Guiding bolts for alignment Jacking up cabin top Temporary compression post contraption
Posted on January 4, 2018January 5, 2018G10 work Additional gasket for the rudder post to have a tighter fit. Backing plates for new stanchions New base plate for the compression post